A curated selection of maximum value offers!
In cart {{totalProductsCount}} item(s)
Your cart is empty
PDU Rittal metered 32A 1P CEE input, 16x C13 + 2x C19 outlets
The Rittal metered PDU with a single-phase 32A CEE input provides centralized power distribution and measurement for server cabinets and network racks. It offers sixteen C13 and two C19 outlets in a compact, rack-mountable form factor for powering a range of IT equipment while enabling basic power monitoring to support capacity planning and load balancing.
This PDU combines robust power delivery with integrated metering, allowing administrators to monitor real-time current and power consumption at the unit level. The mix of sixteen C13 and two C19 outlets supports devices with different inlet types without additional adapters. The single-phase 32A CEE input supplies sufficient current for medium-density racks and reduces the need for multiple upstream feeds. The rack-oriented design simplifies installation in standard 19-inch enclosures.
This PDU is designed for single-phase power distribution and is not intended for three-phase power systems. Locations that require redundant dual-feed PDUs or per-outlet switching and metering may need a different model with those capabilities. Very high-density racks that exceed the rated 32A single-phase feed will require PDUs with higher input current or multiple PDUs.
Install the PDU into a suitable position in the server cabinet following the cabinet manufacturer’s mounting guidelines. Connect the single-phase 32A CEE input to a dedicated upstream supply using appropriate cabling and protection. Plug IT equipment into the C13 and C19 outlets according to their inlet types. Use the integrated meter to observe current and power consumption for the whole PDU; record measurements to support capacity planning and avoid load limits. Follow local electrical codes and safety practices during installation and maintenance.
For reliable operation, distribute connected load evenly across outlets where possible and maintain clear documentation of outlet assignments. Periodically review the PDU meter readings as part of routine capacity checks. If redundancy or per-outlet control is required, consider integrating additional PDUs or selecting a model with those features.
{{highlightedFeature.featureTitle}}:
{{getProductFeatureValueById(product, highlightedFeature.featureId)}}
{{ productComparisonGenerationError }}