Leave your address - as soon as the price of the product goes down, you'll know about it right away
Electrofusion Saddle (mufa elektrooporowa) Weba 110 mm 02-01-0110-04
Electrofusion Saddle (mufa elektrooporowa) Weba 110 mm 02-01-0110-04
In cart {{totalProductsCount}} item(s)
Your cart is empty
Electrofusion Saddle (mufa elektrooporowa) Weba 110 mm 02-01-0110-04
Leave your address - as soon as the price of the product goes down, you'll know about it right away
Electrofusion Saddle (mufa elektrooporowa) Weba 110 mm 02-01-0110-04
Electrofusion Saddle (mufa elektrooporowa) Weba 110 mm 02-01-0110-04
Electrofusion Saddle (mufa elektrooporowa) Weba 110 mm 02-01-0110-04 is an electrofusion branch saddle designed to create a welded T-branch or service connection on polyethylene (PE) pipelines without cutting out a section of the main pipe. Manufactured by Weba for 110 mm nominal pipe diameter, this saddle provides a secure, integrated branch that is intended for installation with compatible electrofusion equipment and fittings in gas, water or sewage distribution systems.
The Weba electrofusion saddle delivers a welded, leak-resistant branch connection that reduces the need for mechanical fittings and external clamps. Its design enables a consistent electrofusion process when used with the recommended control unit and heating cycles, ensuring reliable joints with reduced risk of infiltration. Installation conserves pipeline integrity by avoiding full pipe replacement or complex excavation required for traditional tapping methods.
Prepare the PE main pipe by cleaning and scraping the surface according to the electrofusion saddle manufacturer's instructions to expose sound polymer. Position the Weba saddle on the prepared area and clamp it securely to prevent movement during welding. Connect the saddle's electrofusion terminals to a compatible electrofusion control unit, select the correct program for the saddle and pipe material, and run the heating cycle. Allow the joint to cool under restraint for the recommended time before removing clamps and applying pressure to the system. Installation must be performed by trained personnel following local regulations and manufacturer guidelines.
Use certified electrofusion equipment and follow Weba's specified heating programs and cooling times. Ensure all site safety procedures are observed, and verify material compatibility with existing PE pipes. For critical systems such as gas distribution, perform pressure testing and documentation as required by local standards.
{{highlightedFeature.featureTitle}}:
{{getProductFeatureValueById(product, highlightedFeature.featureId)}}