Leave your address - as soon as the price of the product goes down, you'll know about it right away
T-Union 1/2” for heating element FERRO T-KUS.0 – chrome connector
T-Union 1/2” for heating element FERRO T-KUS.0 – chrome connector
In cart {{totalProductsCount}} item(s)
Your cart is empty
T-Union 1/2” for heating element FERRO T-KUS.0 – chrome connector
Leave your address - as soon as the price of the product goes down, you'll know about it right away
T-Union 1/2” for heating element FERRO T-KUS.0 – chrome connector
T-Union 1/2” for heating element FERRO T-KUS.0 – chrome connector
Chrome-plated T-union with 1/2” thread size from FERRO, model T-KUS.0, designed for connecting three pipe or fitting connections where a heating element is installed. The connector is intended for use in central heating or hot-water systems and provides a compact solution for distribution or bypass lines around the heating element. The chrome finish offers corrosion resistance and a clean appearance suitable for visible plumbing installations.
The FERRO T-KUS.0 T-union is manufactured to match standard 1/2” threaded plumbing connections, enabling straightforward installation with compatible fittings and heating elements. Its chrome-plated surface reduces surface corrosion and simplifies cleaning while delivering a uniform look in exposed locations. The compact T-shape allows for efficient routing of supply, return, and bypass lines without requiring additional adapters.
Shut off system water and depressurize the relevant section before installation. Screw the T-union onto compatible 1/2” threaded pipes or fittings and into the heating element connection point, ensuring a proper seal with appropriate sealing material (e.g., thread seal tape or approved jointing compound) where required. Tighten to a suitable torque to avoid damage to threads or fittings, then restore system pressure and check for leaks at all joints.
Use compatible 1/2” threaded fittings and standard plumbing sealing materials. Inspect threads and chrome plating for damage before installation and avoid excessive tightening. After installation, perform a pressure and leak test following local plumbing and heating regulations.
{{highlightedFeature.featureTitle}}:
{{getProductFeatureValueById(product, highlightedFeature.featureId)}}